Jimel Oilfield  "We will keep you well informed."
 Wednesday, August 20, 2008   ..:: Scouting Services | Completion Operations ::..  Search  |  Login 
    Minimize
Completion Operations

Completion or evaluation scouting information recovered:

08:00 hr operation Type of frac to be used - sand, acid,
water, volume, etc...
Well status - flowing or shut in Build up/flow pressures after frac
Services used
(wireline, snubbing, fracing, etc...)
Flare description
Perforation intervals # of swabs and recovery data
(swabbing depths if swabbing is required)
Snubbing pressures
(if snubbing service required)
Estimated and/or confirmed Flow and Gas rates
Packer and prong settings (depth) Shut in pressures
Bridge plug setting (depth) Fluid recovery (types of fluid)
Shut in/flowing tubing pressure Salinity
Shut in/flowing casing pressure PH
Build up/flow pressure before frac 24 hr daily summary and remarks report

If this is the information you need, please complete our Scouting request form or Contact Us directly for further assistance.

service rig

tubing


    Minimize
Flare

 |  Terms Of Use |  Privacy Statement
Copyright 2007 by Jimel